F
Heriot Bay – Whaletown (Cortes)
Reliability FPunctuality Dworsening
A severe mechanical reliability decline: 256 mechanical cancellations drove the route to a 7.3% cancellation rate.
92.7%
sailings completed
reliability F · 7.3% cancelled (mechanical)
78%
on-time
punctuality D · within 10 min of schedule
F
overall grade (FY2026)
weakest link — worse of the two
Total cancellations: 330 in FY2026 vs 132 in FY2025 — trend is worsening.
How this route compares
On-time78%
system average 86.1%
Cancelled7.3%
system average 0.7% · scale 0–8%
Left vehicles behind26.1%
system average 17% · scale 0–60%
What the cancellations were79% mechanical
■ mechanical (maintenance) · ■ weather / crew / other
Were you delayed on this route?
The official policy may cover an unaccommodated cancelled booking or documented qualifying expenses. The builder checks those details before writing your request.
Build a claim →Documented incidents on this route
None documented yet.
Recent live disruptions captured
None captured recently on this route. See the live board →