F
Horseshoe Bay – Departure Bay (Nanaimo)
Reliability CPunctuality Fworsening
Zero crew-related cancellations in 2025 (down from 127 in 2023) — but total cancellations tripled year-over-year, and on-time is just 70%.
98.6%
sailings completed
reliability C · 1.4% cancelled (weather / mechanical)
70.2%
on-time
punctuality F · within 10 min of schedule
F
overall grade (FY2025)
weakest link — worse of the two
Total cancellations: 80 in FY2025 vs 25 the year before — trend is worsening.
Were you delayed on this route?
If your sailing was held up by something within BC Ferries’ control, you may be owed a travel credit. We’ll write the claim for you in about two minutes.
Build a claim →Documented incidents on this route
None documented yet.
Recent live delays captured
None captured recently on this route. See the live board →