B
Langdale – Gambier – Keats
Reliability BPunctuality Asteady
99.4%
sailings completed
reliability B · 0.6% cancelled (weather)
99.5%
on-time
punctuality A · within 10 min of schedule
B
overall grade (FY2025)
weakest link — worse of the two
How this route compares
On-time99.5%
system average 84%
Cancelled0.6%
system average 1.4% · scale 0–8%
What the cancellations were0% mechanical
■ mechanical (maintenance) · ■ weather / crew / other
Were you delayed on this route?
If your sailing was held up by something within BC Ferries’ control, you may be owed a travel credit. We’ll write the claim for you in about two minutes.
Build a claim →Documented incidents on this route
None documented yet.
Recent live delays captured
None captured recently on this route. See the live board →