F
Tsawwassen – Duke Point (Nanaimo)
Reliability BPunctuality Fimproving
Rarely cancelled, but the worst on-time of any major route (67%). And in April 2026 a post-refit control-system failure cancelled sailings for days. See incidents.
99.3%
sailings completed
reliability B · 0.7% cancelled (weather)
67%
on-time
punctuality F · within 10 min of schedule
F
overall grade (FY2025)
weakest link — worse of the two
Total cancellations: 40 in FY2025 vs 88 the year before — trend is improving.
Were you delayed on this route?
If your sailing was held up by something within BC Ferries’ control, you may be owed a travel credit. We’ll write the claim for you in about two minutes.
Build a claim →Documented incidents on this route
Duke Point vessel shelved after refit
Post-refit steering / propulsion control failure
Recent live delays captured
None captured recently on this route. See the live board →