F
Tsawwassen – Southern Gulf Islands
Reliability BPunctuality Fimproving
99.2%
sailings completed
reliability B · 0.8% cancelled (weather)
66.4%
on-time
punctuality F · within 10 min of schedule
F
overall grade (FY2025)
weakest link — worse of the two
Total cancellations: 50 in FY2025 vs 67 the year before — trend is improving.
Were you delayed on this route?
If your sailing was held up by something within BC Ferries’ control, you may be owed a travel credit. We’ll write the claim for you in about two minutes.
Build a claim →Documented incidents on this route
None documented yet.
Recent live delays captured
None captured recently on this route. See the live board →