FerryWatch
Menu
Board · Route 3 · Major · Sunshine Coast
D

Horseshoe Bay – Langdale

Reliability BPunctuality Dsteady

Every FY2026 cancellation was classified as mechanical. Separate 2026 incident records document repeated vessel and terminal failures.

99.3%
sailings completed
reliability B · 0.7% cancelled (mechanical)
79.9%
on-time
punctuality D · within 10 min of schedule
D
overall grade (FY2026)
weakest link — worse of the two

Total cancellations: 48 in FY2026 vs 53 in FY2025 — trend is steady.

How this route compares

On-time79.9%
system average 86.1%
Cancelled0.7%
system average 0.7% · scale 0–8%
Left vehicles behind30.1%
system average 17% · scale 0–60%
What the cancellations were100% mechanical
mechanical (maintenance) · weather / crew / other

Were you delayed on this route?

The official policy may cover an unaccommodated cancelled booking or documented qualifying expenses. The builder checks those details before writing your request.

Build a claim →

Documented incidents on this route

Saturday, May 16, 2026
Langdale ramp failure
Upper car ramp mechanical failure
Wednesday, April 15, 2026
Queen of Surrey generator failure
Vessel generator failure (Queen of Surrey)

Recent live disruptions captured

None captured recently on this route. See the live board →

Sources