FerryWatchprovisional name
Routes · Route 3 · Major · Sunshine Coast
D

Horseshoe Bay – Langdale

Reliability BPunctuality Dsteady

FY2025 cancellations were flat — but in 2026 the Queen of Surrey suffered repeated breakdowns and a Langdale ramp failure stranded riders for hours. See incidents below.

99.2%
sailings completed
reliability B · 0.8% cancelled (mechanical / weather)
72.2%
on-time
punctuality D · within 10 min of schedule
D
overall grade (FY2025)
weakest link — worse of the two

Total cancellations: 53 in FY2025 vs 53 the year before — trend is steady.

Were you delayed on this route?

If your sailing was held up by something within BC Ferries’ control, you may be owed a travel credit. We’ll write the claim for you in about two minutes.

Build a claim →

Documented incidents on this route

Saturday, May 16, 2026
Langdale ramp failure
Upper car ramp mechanical failure
Wednesday, April 15, 2026
Queen of Surrey generator failure
Vessel generator failure (Queen of Surrey)

Recent live delays captured

None captured recently on this route. See the live board →

Sources